Redemption Point
Built in two phases, this 14,000 steel building entailed an addition to an existing Nucor structure originally built in 2003. Surrounded by parapet walls, the expansion is a combination of three single slope buildings with a new gabled entrance. The skewed design of the narthex includes a curtain wall glass entrance and a below eave canopy.
- Location: Ooltewah, TN
- Size: 33,000 sf
- Wall System: Nucor Classic Wall with EIFS
- Roof System: Nucor CFR & VR16 II
- End Use: Church Expansion