Clear Span Sports Facility

A multi-purpose building and indoor football practice facility, Highland Park High School is a 206’ clear span with a clear peak height of 37’, and also includes a clear span lean-to.

This custom steel building was erected over sub-grade soil, without concrete foundation. A challenge in constructing this project was the adjacent buildings on the west and north side, leaving a mere 15’ of space for construction.

  • Location: Dallas, TX
  • Size: 57,800 sf
  • Wall System: Brick on studs
  • Roof System: Nucor CFR Standing Seam
  • End Use: Indoor football practice facility
Open PDF Download PDF