NBS Builder eNews | Nucor Building Systems
 
Logo
February 2020
Attend one of Our Builder and Erector Schools!

Welcome to the February eNews!

In addition to this month’s eQuote update, we’re sharing a Nucor Public Affairs Update, and an Energy Codes article on inputting wall and roof systems. In addition, check out our tips on copy functions in eQuote to save you time during estimating. Finally, don’t forget registration for Regional Builder Meetings is now open.

Nucor Public Affairs Update

image

The USMCA has been ratified by the Mexican Senate and the U.S. Congress passed implementing legislation that was signed by President Trump on January 29, 2020, with several Nucor teammates in attendance.

Read More

Registration for Regional Builder Meetings Now Open

image

Please join us at our Regional Builder Meetings. Each meeting will cover a range of important industry topics, demonstrate Nucor products and sales tools, and offer opportunities to connect and network with your division representatives as well as other building professionals.

Register

Felderman Design-Build finishes Direct Care Facility

image

Located in Fort Wayne, IN, this 10,725 sf multi-tenant building, which includes Direct Care, utilizes a Nucor pre-engineered metal building structure, chosen for the ease of design and erection. Direct Care consists of a clinic and imaging side, with a design intent of a clean, modern space.

Read More

Entering Non-listed Insulation Systems in COMcheck

image

This month’s Energy Codes article focuses on how to correctly input roof or wall insulation systems when the system in question is not represented in the pre-populated “Construction Details” drop down menu in COMcheck.

Read More

eQuote Update Scheduled

image

There is an eQuote update scheduled for February 10, 2020, from approximately 10:30 p.m. to 11:55 p.m. Eastern Standard Time. The site will be unavailable during this update.

Read More

Tips from eQuote: Using the Copy Function for Efficiency

image

Our Tips from eQuote series is designed to highlight existing features, tips and tricks within the software program that you may or may not already be aware of. These tips can help increase efficiency when quoting a project. In this article, learn how the Copy Function can be used to save time with multiple entries.

Read More